Why so many Henderson projects need approval
Henderson grew largely through master-planned communities — Anthem, Green Valley, Seven Hills, Inspirada, Cadence, MacDonald Highlands and Lake Las Vegas, among others — and most of them have governing documents and an architectural review committee (ARC). The committee's job is to keep the look of the community consistent, which means it reviews changes that people can see from the street.
How the rules fit together
In Nevada, a community's declaration, known as the CC&Rs, is its primary governing document. Architectural guidelines and association rules have to be consistent with it, and state law (NRS 116) takes priority over the governing documents unless they are more stringent. In practice that means two things: your community's CC&Rs and design guidelines are the first place to look, and the form and process for requesting a change should be available from your association or management company. If a neighbor's signature is required, the form usually says so.
What usually needs HOA approval
The rule of thumb used by most master-planned communities is simple: if it changes the exterior appearance of your home or lot, submit it first. Common examples are exterior paint and finishes, roofing, front doors, fences, walls and gates, patio covers and pergolas, pools, solar panels, driveways, visible equipment and exterior lighting. Landscaping changes are often reviewed too. The list is never exhaustive, so when in doubt, ask.
What usually does not
Interior work is normally outside HOA review: one-room and touch-up painting, cabinets, TV mounting and similar. Townhome and condo associations are the exception — they may have rules about flooring underlayment, noise and work hours — so check your documents before you start.
HOA approval and city permits are separate
One does not replace the other. Approval from your association does not mean the work is permitted, and a permit does not mean the association has approved it. In Henderson, work such as new or replaced water heaters, new wiring or panels, structural changes, additions and roof or stucco replacements generally needs a city permit. Painting, flooring, cabinets, replacing a faucet or garbage disposal without changing the layout, and fences within height limits are generally exempt. Confirm with the City of Henderson for your specific project.
How to submit a clean application
Delays usually come from incomplete submissions. Get the current form from your management company and include what the committee will ask for: a clear description of the work, color names and codes, material samples or product links, photos of the house and the area, measurements or a simple sketch, and neighbor signatures if the form requires them. Keep a copy of everything. Review windows of roughly 30 to 45 days are common in large communities, so apply well before you want to start, and do not begin work until you have written approval.
Nevada law and your rights
Nevada law limits how far an association can go in some areas, such as drought-tolerant landscaping and solar installations, although the association can usually still regulate how those projects look. If you believe a decision was unfair, the Nevada Real Estate Division's Office of the Ombudsman for Common-Interest Communities is the place to start. This is general information, not legal advice.
How we help
We do not replace your HOA's process, but we make it easier. Before you apply, we can give you a written scope and estimate with the materials and colors, and once approval comes through we work from exactly what was approved. If you are planning exterior paint, a new door or exterior repairs, see our Henderson pages for exterior touch-up painting, door replacement and or start at our Henderson page.
Frequently Asked Questions
Do I need HOA approval to paint the inside of my Henderson home?
No. Interior painting is normally outside HOA review. Exterior paint colors and finishes usually do need approval, so check your community's palette before you buy paint.
Does an HOA approval replace a city permit?
No. They are separate. HOA approval covers how the work looks and fits the community's rules; a city permit covers building and safety codes. Some projects need both, some need only one, and many interior projects need neither.